Knock Down Rebuild

Sydney, Newcastle, Central Coast & South Coast

Knockdown Rebuild Specialists

Experts in Knockdown Rebuild Projects You can’t deny how much you love your current location—the scenery, the property, and the neighborhood are all perfect. Simply put, moving is not an option.

If you live in Sydney, the Central Coast, Newcastle, or even the South Coast, you might want to think about working with Weaver Homes on a knockdown and rebuild project. Our dedicated group of knockdown rebuild specialists will work closely with you to design a brand-new house that meets all of your requirements and wants. 

Why Knock Down And Rebuild?

While your current home may have charm and character, its serviceability to the needs of your family has long expired. With a knock down and rebuild, you ultimately have greater control over the build. You get to choose your preferred layout, and define the overall aesthetic with your personal style, finishes, and colour schemes.

In our experience (and from listening to many of our customers), here are a few pros to choosing to knock down rebuild:

A BLANK CANVAS

You’re not restricted by working within an existing structure or floor plan

TIME SAVING

Rebuilding is usually faster than renovating an entire home

IMPROVE YOUR RESALE VALUE AND CAPITAL

Enhances the value of your property, no stamp duty or real estate fees, that’s money left in your account!

LATEST MATERIALS AND TECHNOLOGY

Today’s homes are more energy efficient – save money on bills & time on maintenance

SEAMLESS AESTHETIC

No mismatched areas with ‘renovated’ versus ‘non-renovated’ sections throughout your home

WARRANTIES

Relax knowing that Weaver Homes complies with the various statutory warranties to ensure you’re covered

COST TO KNOCKDOWN REBUILD

Renovating your home might seem like fun, but it can often cost you more per square metre than knocking down and building new!

The cost of a knockdown rebuild is dependent on your site conditions, council requirements, and the selections used for your home, including external materials, as well as internal fixtures and fittings.

How Long Does A Knockdown Rebuild Take?

The duration of a knockdown and rebuild project can vary depending on a number of factors, such as whether the building is single-story or two-story, or whether it is a duplex or two-family. A double-story building typically takes between ten and twelve months to complete. However, a variety of factors influence this timetable, including:

Size of Build: The duration is significantly influenced by the construction’s overall size and complexity. The completion of larger or more intricate designs may take longer.

Approval for Local Planning: The time expected to acquire nearby arranging endorsements can shift contingent upon your area and the particular prerequisites of your undertaking.

Permits from the Council: A crucial step in the process is obtaining the necessary permits from the local council. The total time frame may be impacted by the length of time it takes to obtain these permits.

Preparing the Site and the Soil: Construction can be influenced by site conditions, like the quality of the soil. Site preparation and addressing soil-related issues may require additional time.

Removal of Trees: The duration of the project may be extended if there are trees on the property that need to be cut down or moved.

Preparation of the Site and Demolition: A crucial phase that has the potential to affect the schedule is the demolition of the existing structure and the preparation of the site for construction. This may require disconnecting or removing services like water, gas, and electricity.

Weather and the Economy: During the construction phase, delays can be caused by weather conditions and disruptions in the supply chain. The pace of work may be affected by unanticipated factors.

It is essential to acknowledge that these variables affect the timeline for a knockdown rebuild. While a double-story build typically takes 10 to 12 months, individual projects may move faster or slower depending on the circumstances. To ensure that your project moves along without hiccups and a realistic timeline, it’s best to collaborate closely with your builder. 

Knockdown Rebuild Costs: A Wise Investment

Contact us

Get in touch with our expert agents

Have any question?